← Back to Grants

Multi-phase modelling and characterisation of mudrush hazard in cave mining. A mudrush is a sudden, uncontrolled flow of wet fine particles (mud) into an underground mine that damages equipment, infra

The University of Adelaide — Linkage Projects
Amount
Up to $848,151
Closes
Friday 30 June 2028
Status
unknown
Type
open opportunity
Apply Now →

Description

Multi-phase modelling and characterisation of mudrush hazard in cave mining. A mudrush is a sudden, uncontrolled flow of wet fine particles (mud) into an underground mine that damages equipment, infrastructure, and can even cause fatalities. This project aims to develop cost-effective management and monitoring of mudrush hazards within the at-risk Carrapateena cave mine operated by OZ Minerals. Building on recent technological and numerical advances, a novel experimental–theoretical–numerical approach will be used to simulate mudrush risk based on moisture content, particle sizes, compaction, geological conditions, and seismic energy. Outputs will include a practical framework to boost the safety, productivity, and profitability of caving operations to benefit miners and the broader resources industry.. Scheme: Linkage Projects. Field: 4019 - Resources Engineering and Extractive Metallurgy. Lead: A/Prof Murat Karakus

Categories
artsenterprisetechnology
Target Recipients
researchersuniversities

Foundations Supporting This Area

Discovery method: arc-grants
Last verified: Monday 2 March 2026
Added: Saturday 28 February 2026